Selected article for: "group difference and standard deviation"

Author: Bird, Grace; Braithwaite, Irene; Harper, James; McKinstry, Steven; Koorevaar, Iris; Fingleton, James; Semprini, Alex; Dilcher, Meik; Jennings, Lance; Weatherall, Mark; Beasley, Richard
Title: Protocol for a randomised, single-blind, two-arm, parallel-group controlled trial of the efficacy of rhinothermy delivered by nasal high flow therapy in the treatment of the common cold
  • Document date: 2019_6_19
  • ID: x2xc1s14_202
    Snippet: [16] The upper confidence limit for the standard deviation in this trial was 6.6. A sample size of 76 in each group allows the detection of a difference of 3.5 units, with 90% power and a Type I error rate of 5%. This feasibility study had a dropout rate of zero however, even though the likelihood of dropouts in our study is low, in order to ensure that this study remains adequately powered we will allow for a 10% dropout rate in our power calcul.....
    Document: [16] The upper confidence limit for the standard deviation in this trial was 6.6. A sample size of 76 in each group allows the detection of a difference of 3.5 units, with 90% power and a Type I error rate of 5%. This feasibility study had a dropout rate of zero however, even though the likelihood of dropouts in our study is low, in order to ensure that this study remains adequately powered we will allow for a 10% dropout rate in our power calculation.

    Search related documents:
    Co phrase search for related documents
    • error rate and sample size: 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25
    • error rate and standard deviation: 1, 2, 3, 4
    • error rate and trial standard deviation confidence limit: 1
    • error rate and upper trial standard deviation confidence limit: 1
    • feasibility study and power calculation: 1
    • feasibility study and sample size: 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 31, 32, 33, 34, 35, 36, 37
    • feasibility study and standard deviation: 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14
    • power calculation and sample size: 1, 2, 3, 4, 5, 6, 7, 8, 9
    • power calculation and standard deviation: 1
    • sample size and standard deviation: 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 31, 32
    • sample size and trial standard deviation: 1
    • sample size and trial standard deviation confidence limit: 1
    • sample size and upper trial standard deviation confidence limit: 1
    • standard deviation and trial standard deviation: 1, 2, 3
    • standard deviation and trial standard deviation confidence limit: 1
    • standard deviation and unit difference: 1, 2
    • standard deviation and upper trial standard deviation confidence limit: 1
    • trial standard deviation and upper trial standard deviation confidence limit: 1
    • trial standard deviation confidence limit and upper trial standard deviation confidence limit: 1