Selected article for: "confidence interval and estimate number"

Author: Hongzhe Zhang; Xiaohang Zhao; Kexin Yin; Yiren Yan; Wei Qian; Bintong Chen; Xiao Fang
Title: Dynamic Estimation of Epidemiological Parameters of COVID-19 Outbreak and Effects of Interventions on Its Spread
  • Document date: 2020_4_6
  • ID: ff4937mj_48
    Snippet: where a 1 and b 1 are the corresponding under-reporting factors for the time period of [1, 2, ..., T + 1], and M 1 represents the true cumulative number of infections by day 1 or January 18, 2020. Using the number of infected cases exported from Wuhan internationally, Imai et al. 12 estimate that the cumulative number of infections in Wuhan by January 18, 2020 is 4,000 with a 95% confidence interval [1, 800] in the baseline scenario. Additionally.....
    Document: where a 1 and b 1 are the corresponding under-reporting factors for the time period of [1, 2, ..., T + 1], and M 1 represents the true cumulative number of infections by day 1 or January 18, 2020. Using the number of infected cases exported from Wuhan internationally, Imai et al. 12 estimate that the cumulative number of infections in Wuhan by January 18, 2020 is 4,000 with a 95% confidence interval [1, 800] in the baseline scenario. Additionally, to account for 2 million people leaving Wuhan due to Wuhan lockdown on January 23, 2020, we set the population size N to be 11 million (i.e., regular population size in Wuhan 35 ) before January 23, 2020 and adjust it to 9 million after January 23, 2020 36 . With the above setting and the observed official numbers [Q o i , R o i ] T +1 i=1 , we can estimate parameters Θ 1 = (β 1 , µ 1 , γ 1 , a 1 , b 1 ) and compute [S i ,

    Search related documents:
    Co phrase search for related documents
    • baseline scenario and cumulative number: 1, 2, 3
    • baseline scenario and population size: 1, 2, 3, 4, 5
    • baseline scenario and time period: 1, 2, 3
    • confidence interval and cumulative number: 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25
    • confidence interval and official number: 1, 2, 3
    • confidence interval and parameter estimate: 1, 2, 3, 4, 5
    • confidence interval and population size: 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20
    • confidence interval and reporting factor: 1
    • confidence interval and time period: 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25
    • cumulative number and infection cumulative number: 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18
    • cumulative number and official number: 1, 2, 3, 4, 5, 6, 7, 8, 9, 10
    • cumulative number and parameter estimate: 1, 2, 3, 4
    • cumulative number and population size: 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17
    • cumulative number and time period: 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25
    • infect case and time period: 1
    • observed official number and official number: 1
    • official number and population size: 1, 2
    • official number and reporting factor: 1
    • official number and time period: 1