Author: Oscar Patterson-Lomba
Title: Optimal timing for social distancing during an epidemic Document date: 2020_4_1
ID: cm91jxde_23
Snippet: Simulations for the optimal t 0 : flattening the epidemic Optimal t 0 for peak delay Figure (4) also indicates that R 0 is the key factor in determining the optimal time to initiate social distancing if the goal is to delay the epidemic peak. Again, as R 0 increases, the sooner social distancing should start (see Figure (6)). Longer T and smaller r yield greater delays (up to 250 days), as expected (see Figure (9) in Appendix 3). Finally, the low.....
Document: Simulations for the optimal t 0 : flattening the epidemic Optimal t 0 for peak delay Figure (4) also indicates that R 0 is the key factor in determining the optimal time to initiate social distancing if the goal is to delay the epidemic peak. Again, as R 0 increases, the sooner social distancing should start (see Figure (6)). Longer T and smaller r yield greater delays (up to 250 days), as expected (see Figure (9) in Appendix 3). Finally, the lower the R 0 the greater the delay in peak timing.
Search related documents:
Co phrase search for related documents- epidemic peak and optimal time: 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12
- epidemic peak and peak timing: 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25
- epidemic peak and peak timing delay: 1, 2
- epidemic peak and social distancing: 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25
- epidemic peak and social distancing initiate: 1, 2, 3, 4, 5, 6
- epidemic peak and sooner social distancing: 1, 2, 3, 4
- epidemic peak delay and optimal time: 1, 2, 3
- epidemic peak delay and peak timing: 1, 2, 3, 4, 5
- epidemic peak delay and peak timing delay: 1, 2
- epidemic peak delay and social distancing: 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20
- epidemic peak delay and social distancing initiate: 1, 2, 3, 4
- epidemic peak delay and sooner social distancing: 1, 2
- key factor and social distancing: 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20
- key factor and social distancing initiate: 1
- key factor and sooner social distancing: 1
- optimal time and peak timing: 1, 2, 3
- optimal time and peak timing delay: 1, 2
- optimal time and social distancing: 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25
- optimal time and social distancing initiate: 1, 2, 3, 4, 5, 6, 7, 8, 9, 10
Co phrase search for related documents, hyperlinks ordered by date