Author: Peter Boldog; Tamas Tekeli; Zsolt Vizi; Attila Denes; Ferenc Bartha; Gergely Rost
Title: Risk assessment of novel coronavirus COVID-19 outbreaks outside China Document date: 2020_2_5
ID: ecu579el_45
Snippet: Different control measures affect different key parameters. Several of these measures have been readily implemented in China, aiming to prevent transmissions. These are incorporated into our transmission model influencing the cumulative number of cases C. The connectivity θ may be affected, for example, by exit screening at Chinese airports, entry screening at the destination airport, and a . CC-BY-NC-ND 4.0 International license It is made avai.....
Document: Different control measures affect different key parameters. Several of these measures have been readily implemented in China, aiming to prevent transmissions. These are incorporated into our transmission model influencing the cumulative number of cases C. The connectivity θ may be affected, for example, by exit screening at Chinese airports, entry screening at the destination airport, and a . CC-BY-NC-ND 4.0 International license It is made available under a is the author/funder, who has granted medRxiv a license to display the preprint in perpetuity.
Search related documents:
Co phrase search for related documents- case cumulative number and cumulative number: 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25
- case cumulative number and International license: 1
- case cumulative number and transmission model: 1
- case cumulative number influence and cumulative number: 1
- cc NC ND International license and control measure: 1, 2, 3
- cc NC ND International license and cumulative number: 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23
- cc NC ND International license and International license: 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25
- cc NC ND International license and key parameter: 1
- cc NC ND International license and transmission model: 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19
- control measure and cumulative number: 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13
- control measure and different control measure: 1, 2
- control measure and entry screening: 1, 2, 3, 4, 5, 6
- control measure and exit screening: 1
- control measure and International license: 1, 2, 3, 4, 5, 6
- control measure and transmission model: 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12
- cumulative number and entry screening: 1, 2, 3, 4
- cumulative number and International license: 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25
- cumulative number and key parameter: 1
- cumulative number and transmission model: 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25
Co phrase search for related documents, hyperlinks ordered by date