Selected article for: "high risk and potential risk"

Author: Nicholas G Reich; Justin Lessler; Jay K Varma; Neil M Vora
Title: Quantifying the Risk and Cost of Active Monitoring for Infectious Diseases
  • Document date: 2017_6_28
  • ID: h89scli5_9
    Snippet: We developed open-source software, including a freely-available web application at http://iddynamics.jhsph. edu/apps/shiny/activemonitr/. The source code for the web app, the data for the analyses, and the code The copyright holder for this preprint (which was not peer-reviewed) is the author/funder. It . https://doi.org/10.1101/156497 doi: bioRxiv preprint CDC issued recommendations on risk stratification of individuals for a potential Ebola vir.....
    Document: We developed open-source software, including a freely-available web application at http://iddynamics.jhsph. edu/apps/shiny/activemonitr/. The source code for the web app, the data for the analyses, and the code The copyright holder for this preprint (which was not peer-reviewed) is the author/funder. It . https://doi.org/10.1101/156497 doi: bioRxiv preprint CDC issued recommendations on risk stratification of individuals for a potential Ebola virus exposure ("high risk", "some risk", "low (but not zero) risk", "no identifiable risk") and for how long and how intensively individuals in each of these categories should be monitored. (20) DOHMH's active monitoring program, described previously (21) , was implemented consistent with CDC recommendations. However, creating, evaluating, and modifying such classifications in practice is a difficult task and requires situational awareness and data that would vary depending on the pathogen and outbreak setting.

    Search related documents:
    Co phrase search for related documents
    • CDC recommendation and high risk: 1
    • difficult task and high risk: 1, 2
    • difficult task and open source: 1, 2
    • Ebola virus and high risk: 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25
    • Ebola virus and monitoring program: 1, 2, 3
    • Ebola virus and open source: 1, 2, 3
    • Ebola virus exposure and high risk: 1
    • freely available web application and open source: 1, 2
    • high risk and identifiable risk: 1, 2, 3
    • high risk and individual risk stratification: 1
    • high risk and monitoring program: 1, 2, 3, 4, 5, 6, 7
    • high risk and open source: 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16
    • identifiable risk and monitoring program: 1