Selected article for: "period total second and total second"

Author: Ramses Djidjou-Demasse; Yannis Michalakis; Marc Choisy; Micea T. Sofonea; Samuel Alizon
Title: Optimal COVID-19 epidemic control until vaccine deployment
  • Document date: 2020_4_6
  • ID: 5sdzyj0q_28
    Snippet: The first integral corresponds to the total number of deaths over the time period considered and the second represents the total cost associated with the implementation of the control measures. As earlier studies [14, 17] , we assumed a quadratic expression in the second term associated to the control to capture non-linear costs potentially arising for intense control implementations. When the objective function is quadratic with respect to the c.....
    Document: The first integral corresponds to the total number of deaths over the time period considered and the second represents the total cost associated with the implementation of the control measures. As earlier studies [14, 17] , we assumed a quadratic expression in the second term associated to the control to capture non-linear costs potentially arising for intense control implementations. When the objective function is quadratic with respect to the control, differential equations arising from optimization have a known solution. Other functional forms often lead to systems of differential equations that are difficult to solve [15] . Finally, B is a coefficient allowing to weight the "cost" associated to the control implementation (c(t)) relative to the cost due to deaths. Our aim is to find the function c * satisfying

    Search related documents:
    Co phrase search for related documents
    • control implementation and differential equation: 1
    • control implementation and early study: 1, 2
    • control implementation and intense control implementation: 1
    • control implementation and time period: 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12
    • control implementation and total cost: 1
    • control implementation and total number: 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11
    • control measure and differential equation: 1, 2
    • control measure and early study: 1, 2
    • control measure and time period: 1, 2, 3, 4, 5
    • control measure and total cost: 1
    • control measure and total number: 1, 2, 3, 4, 5, 6, 7